AGS
AGSMatter-native grow hub for small indoor rooms
Roadmap

What's shipped, what's next.

One page. No phase-zero marketing fog. Entries move states when the work is actually done. Dates appear only when a milestone is in flight.

  1. HardwareDone

    Hub rev B with dual SHT41, PWM, IR, Matter

    Engineering samples in the field: ESP32-C6 hub, two SHT41 probes on a TCA9548A mux, four PWM channels, 38 kHz IR TX/RX, Matter 1.3 commissioner. Running the production firmware branch.

  2. FirmwareIn flight

    PID anti-windup, lifecycle phases, Matter stability

    Locking phase-aware setpoints (veg, flower, dry), lifecycle schedule walk, and Matter commissioner regressions against a growing plug set.

  3. AppIn flight

    Grow journal polish and IR learn wizard

    Plant lifecycle stages, per-stage fertilization recipes with suggested-dose watering, weekly report photo slots, AC learn wizard with mode x fan matrix.

  4. BackendIn flight

    Hosted AGS cloud, per-tenant auth

    Per-tenant MQTT credentials, multi-device accounts, weekly report refresh endpoint, waitlist collection. Hosted on independent EU infrastructure.

  5. AutomationNext

    Sensor-triggered IR

    IR fires in response to a sensor condition, not only on a schedule. E.g. turn AC 'cool' when VPD crosses a band, turn it off when the band recovers. Not in release today.

  6. HardwareNext

    Rev 0.2 production board

    Final enclosure and power input, pre-CE sample run for EMC/LVD/RED lab work. Studio renders and the one-page datasheet ship with this milestone.

  7. LaunchLater

    v1 production run

    CE-marked production hub, EU shipping first, 12-month warranty, 2-4 week firmware cadence post-launch.

  8. Post-launchLater

    Expanded appliance matrix

    Automation branches for heater, cooler, dehumidifier, circulation (today's firmware enum stubs become real loops), plus a larger hub SKU for multi-tent rooms.

Release cadence

Firmware every 2 to 4 weeks during beta, every 6 to 8 weeks after v1.

Every signed, every visible in the app OTA history. If a week passes without an update, we are debugging rather than cutting.